Norvegija – Statybos darbai – Stovnerio mokyklos priestato statybos, griovimo ir lauko darbų "iki raktų" sutarties pirkimas.
Norvegija – Statybos darbai – Stovnerio mokyklos priestato statybos, griovimo ir lauko darbų "iki raktų" sutarties pirkimas.
I dalis: Perkančioji organizacija
I.1) Pavadinimas ir adresai:
Oficialus
pavadinimas: Oslo kommune v/ Oslobygg KF
Adresas: Grenseveien 82
Miestas: Oslo
Pašto
kodas: 0663
Šalis: Norvegija
Asmuo
ryšiams:
El-paštas: asne.tinnes.rimehaug@obf.oslo.kommune.no
Interneto adresas (-ai):
Pagrindinis adresas: https://www.oslo.kommune.no/etater-foretak-og-ombud/oslobygg/
II dalis: Objektas
II.1.1) Pavadinimas:
Procurement of a turnkey contract for the construction of an extension, demolition and outdoor works for Stovner School.
Nuorodos numeris: 24/6933
II.1.2) Pagrindinis BVPŽ kodas:
45000000
Statybos darbai
II.1.3) Sutarties tipas:
Kita
II.1.4) Trumpas aprašymas:
Oslobygg KF has been given the assignment by the Education Agency in Oslo to build an extension for Stovner school, as well as the development of the school ́s outdoor installations. The school site is 23.4 daa. The extension is approx. 3,365 m2 FUA (functional area) and approx. 5,570 m2 gross in three floors, the basement is partly below ground due to the terrain form. In addition various sheds of approx. 110 m2 shall be constructed.
The contract includes the demolition of discontinued teaching pavilions, as well as two concrete wings from the original school building from 1970. In addition, light renovation of approx. 1,000 m2 of the original school building shall be carried out.
The contract also includes improvements to public roads in Stovnerfaret within the planning area, as well as improvements to public roads in accordance with the order requirements, in Olaus Fjørtoftsvei and Fjellstuveien.
The construction works shall be carried out with the school in operation in the original school building, as well as temporary pavilions in the open air area across Stovnerfaret.
The framework application was sent 04.09.24 and expects a framework permission in November. The prerequisite for the project is that the project with temporary school pavilions at the neighbouring site has been completed and ready for use before the demolition can start.
The site will be available from 01.06.25, with the share of the ground work being completed by the start of the school 15 August 2025. There will be several sub-deliveries, with the last hand over 11.08.27.
II.2) Aprašymas:
II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):
45000000 Statybos darbai