Norvegija – Vamzdynų, ryšių ir elektros energijos tiekimo linijų tiesimo darbai – Contract OB1 - Water and Sewage installations (sea and land) in the project Transfer Facility.
Norvegija – Vamzdynų, ryšių ir elektros energijos tiekimo linijų tiesimo darbai – Contract OB1 - Water and Sewage installations (sea and land) in the project Transfer Facility.
I dalis: Perkančioji organizacija
I.1) Pavadinimas ir adresai:
Oficialus
pavadinimas: Movar Iks
Adresas: Tykkemyr 2
Miestas: Moss
Pašto
kodas: 1597
Šalis: Norvegija
Asmuo
ryšiams:
El-paštas: jorgen.myhre@foyen.no
Interneto adresas (-ai):
II dalis: Objektas
II.1.1) Pavadinimas:
Contract OB1 - Water and Sewage installations (sea and land) in the project Transfer Facility.
Nuorodos numeris: 25/1542
II.1.2) Pagrindinis BVPŽ kodas:
45231000
Vamzdynų, ryšių ir elektros energijos tiekimo linijų tiesimo darbai
II.1.3) Sutarties tipas:
Kita
II.1.4) Trumpas aprašymas:
MOVAR shall expand Fuglevik treatment facility (RA) capacity wise for the future, and to include sewage water that is now cleaned at Kambo RA, which shall be reconstructed to a pre-treatment facility and pump station. MOVAR received a new discharge licence from the Manager in Oslo and Viken, where, from 2026, there will be a requirement for reduction of both phosphor, nitrogen and organic matter. The project is referred to as "Cleaner Oslofjord", and is again divided into two sub-projects «Nye Fuglevik Renseanlegg» and «Overføringsanlegg». The part-project «Overføringsanlegget» comprises laying an approx. 15 km long sewage pipeline from Brevik via Kambo and to Fuglevik Treatment Facility. This sea and land pipeline will run in Mossesundet, cross the infrastructure between Moss and Jeløy, and continue out in Værlebukta to Fuglevik RA. It also includes alterations to the current treatment facility at Kambo to a pump station, a new pump station at Brevik and renovation of Møllebakken pump station. This procurement, OB1 – Water and Sewage installations (sea and land) is one of three planned contracts in the sub-project 'The Transfer Facility', and is an execution contract in accordance with NS8405. It mainly applies to laying a transmission pipeline for sewage in the stretch Brevik – Kambo – Fuglevik, in addition an emission pipeline from the existing discharge foam by the beach at Fuglevik and out to 50 m water depths shall be laid. The total route of approx. 14,800 m is divided into seven areas. It is estimated that the construction period will be approx. 32 months, so that the binding, daily final deadline is 02.06.2028.
II.2) Aprašymas:
II.2.1) Kitas (-i) šio pirkimo BVPŽ kodas (-ai):
45231000 Vamzdynų, ryšių ir elektros energijos tiekimo linijų tiesimo darbai